Construction Punch List Template and Walkthrough
That way, the list tells you what to do next and what happened when you went back to look. Every return trip to fix an item is a cost of the job. To see what those trips do to your price and margin, the free job cost calculator adds up labor, materials, subs and other costs and shows the price, the profit and the margin.
Start with the blank punch list template
Copy the job header once. Then copy the item block for each fix you record. You can use it in a note or print it with space to write. If you use a spreadsheet, put the item fields across the top and give each item its own row.
Job:
Walkthrough date:
Areas walked:
List prepared by:
List version/date:
Item ID:
Room and exact location:
Issue observed:
Fix to make:
Owner:
Work due:
Recheck planned:
Status (Open / Ready to check / Needs more work / Closed):
Assignment notes or dependencies:
Checked by:
Date checked:
What the checker found:
Reference or photo filename, if useful:Start a new item as Open. Fill the check fields after someone looks at the work. When the scope or location is unclear, note what needs confirmation before you assign the fix. The item ID gives everyone a way to refer to the same row even if you sort or print the list in a different order.
Choose fields your crew can check at a glance
Put the location and the fix where someone can spot them first. Your crew should be able to take the list into the room, find the item, and see what to do. The owner and due date tell you who is handling it and when the work is expected. The recheck and check fields tell you what still needs a look.
| Status | What it means |
|---|---|
| Open | The work still needs attention. |
| Ready to check | The person doing the work says it is ready for review. |
| Needs more work | The check found something to correct. |
| Closed | Someone recorded a check and the fix met the description on the row. |
Decide which copy will hold updates. If people mark up printed copies in different rooms, have one person bring those notes back to the current list. Use the item IDs when you move notes over, and mark the date on the updated copy.
Write the location and the fix on the same row
Start with the room name people use on the job. Add a nearby feature that will help someone find the spot, such as the door from the hall or the cabinet beside the sink. Write what you saw, then state what you want to see after the work is done. That last detail gives the checker something to look for.
For example, a row might say “Back hall, linen closet door by the stairs” for the location and “Door rubs at the top when it closes” for the issue. The fix could read “Adjust the door so it opens and closes without rubbing.” A person who missed the walkthrough can find the door, do the work, and check the result from that row alone.
If you take a photo, note the filename beside the item. Keep the location and the fix in writing so the row makes sense on paper.
Record who will do the work and when you will check it
Put one person in charge of each item, even if several people will help. Talk through any order of work that affects the due date. If the next trade needs access after another repair, write that next to the date.
Agree on a work due date and a separate time to look at the fix. The due date tells the person doing the work when you expect it to be ready. The recheck tells the person reviewing it when to return. If part of the work has to be seen before it is covered, note what needs to stay visible for the check. Update the dates on the same row if the schedule changes.
If a person or date is still to be confirmed, write down who will get that answer. At the end of the walk, read those items aloud so everyone knows which assignments still need to be settled.
Keep repeat findings together during the walkthrough
- Walk in an order you can follow again
Note the areas you covered in the job header.
- Add to the row that exists
If an issue is already on the list, find its item ID and add the new detail.
- New spot, new row
The same kind of issue in another room gets its own row and its own check.
- Mark possible extra work for discussion
Write the location and what was raised. Do not give it a repair date yet.
- Read back before you leave each area
Check that the room names make sense to the people doing the work.
When someone flags work that may be outside the agreed scope, review it with the people responsible before you give the crew a repair date. If it is new work, get it signed first. See how to track change orders.
Record who checked the fix and what they found
When an item is ready, take the list to the spot and check the result against the fix you wrote. Enter the checker's name, the date, and what the checker found. For the linen closet example, a useful note is “Opened and closed the door. Top edge cleared the frame.” That records what somebody actually checked.
If the work still needs attention, keep the same item ID. Write down what remains and agree on the next check. Keep any earlier check notes so the crew can see what was already tried. When the check meets the description on the row, mark it Closed and keep the result with the item.
Hand over the checked list with the job records
Review the list by status before you hand it over. Check that closed items have a name, date, and result. For any item still open, make sure the owner and next date are easy to find. If you used a photo or another reference, check that the person receiving the record can find it from the item ID or filename.
Give the checked list a date and keep it with the job records. Keep the remaining work visible in that copy so the next person knows where to pick up. If the last payment on the job is tied to a finished punch list, see how to set up a construction draw schedule.
Where Job Cost Pro fits
Job Cost Pro does not keep your punch list. It has no punch list feature, so keep the list in a note, a spreadsheet or on paper. What it does do: you can attach before and after photos to the job, and they appear on the client's invoice. The receipts, labor and other costs of the return trips go on the same job, so you can see what the punch list cost. Job Cost Pro is free on the App Store: 3 active jobs at a time, 50 receipts a month, AI scanning included, no card. Free plan available. Some features require a paid plan. Get it here.
Track your next job with Job Cost Pro
Scan receipts, confirm the suggested job, and see your recorded costs against your budget. Start with the free plan in your browser or get the iPhone app.
Google Play: US only.
Free plan available. Some features require a paid plan.
FAQ
What is a punch list in construction?
It is the list of small fixes left at the end of a job, written during a walkthrough. Each item names where it is, what to fix, who does it and how it gets checked.
What should a punch list template include?
A job header (job, walkthrough date, areas walked, who made the list, version date) and one row per item: ID, location, issue, fix, owner, due date, recheck date, status, notes and the check result.
Who closes a punch list item?
Someone other than the person who did the work should check it when you can. They write their name, the date and what they found, then mark it Closed.
What if someone asks for work that is not in the scope?
Write it down and mark it for discussion. Review it with the people responsible, and get a signed change order before you give the crew a repair date.
Does Job Cost Pro have a punch list feature?
No. Keep the punch list in a note, a spreadsheet or on paper. Job Cost Pro holds the job costs, including the return trips, and the before and after photos you attach to the job.