How to Job Cost Electrical Work (Service Calls, Remodels and New Circuits)
I'm a remodeler, not an electrician. I hire electricians for the electrical work on my jobs. The math problem is the same in every trade, and electrical work has a few traps of its own. A month of mixed work lands in one profit and loss report: service calls, a panel upgrade, two kitchen remodels, a run of new circuits for a shop. The report can look fine. It can't tell you which of those jobs carried the month and which one lost money. To price one job from its parts, the free job cost calculator adds up labor, materials, subs and other costs and shows the price, the profit and the margin.
Why electrical work hides its margins
- Wire and parts come from many places: some come off the truck, some from the supply house, some from a big box store at 7 in the morning. If truck stock never lands on a job, your jobs look better than they are.
- Labor is most of a service call: the drive, the time to find the fault and the second trip for a part are real costs. They rarely get written to the call that caused them.
- Permits and inspections take time, not only fees: a failed inspection means a return trip. That trip belongs to the job, not to overhead.
- Remodel scope moves: the homeowner adds three can lights and a dedicated circuit for the new fridge. If that work has no signed change order, it is free work.
The cost buckets for an electrical job
| Bucket | What goes in it | Easy to miss |
|---|---|---|
| Wire and parts | Wire, boxes, breakers, devices, fixtures the job supplies | Truck stock used on the job |
| Labor | Hours on the job at the loaded cost (pay plus taxes and insurance) | Drive time, return trips, inspection waits |
| Permits and inspections | Permit fees, inspection fees | The return trip after a failed inspection |
| Subs | Trenching, drywall patch, a second electrician you bring in | Patch and paint after the rough-in |
| Equipment | Lift rental, trencher, special tools rented for the job | Fuel and pickup time for the rental |
The loaded cost of labor is the number most people get wrong. A worker paid $30 an hour (example number) can cost you closer to $38 to $40 an hour (example number) once payroll taxes, workers' comp and insurance are in. See how to calculate labor cost in construction for the full math.
Step by step: job cost one electrical job
- Open the job before work starts
Give it a name the crew knows: "Smith kitchen" or "Elm St. panel".
- Set the budget by bucket
Use the five buckets above. Be honest about labor hours.
- Write every cost to the job the day it happens
A supply house receipt at 7 AM goes on the job before the truck leaves the lot.
- Track hours per job, not per day
If one worker does two service calls and a remodel in one day, split the hours across the three jobs.
- Write return trips to the job that caused them
A failed inspection, a missing part, a callback: all of it goes on the original job.
- Get a signed change order for extra work
Then add it to the job before you do the work.
- Close the job and compare
Price minus total cost is your gross profit. Divide it by the price to get your margin.
For the paperwork side of extra work, see how to track change orders.
A worked example: one kitchen remodel
These are example numbers for teaching, not a price guide. Say the electrical part of a kitchen remodel is priced at $9,500. The budget plans $6,550 of cost. The job ends at $7,500.
| Bucket | Budget | Job |
|---|---|---|
| Wire and parts | $2,200 | $2,450 |
| Labor (loaded) | $3,600 | $4,300 |
| Permits and inspections | $350 | $350 |
| Subs (drywall patch) | $400 | $400 |
| Equipment | $0 | $0 |
| Total | $6,550 | $7,500 |
Where did the $950 go? The homeowner added four can lights with no change order: $250 in parts and $400 of labor. And a failed rough-in inspection meant one return trip ($300 of labor) that nobody wrote to the job. But if every remodel loses 10 points of margin the same way, the month looks busy and the bank account does not move. You only see it if the costs are on the job.
Service calls are where the money hides
A service call looks small, so most people never cost it. Service is mostly labor and drive time, and the second trip is where the profit goes. Cost a sample of 10 service calls for one month. Write the drive time, the hours on site, the parts and any return trip to each call. You will see fast which calls pay and which lose money.
Supply house receipts: one job, or split
One supply house run often feeds two or three jobs. Don't put the whole receipt on whichever job you thought about first. Split it by the parts each job used. See how to split one receipt across multiple jobs.
Where Job Cost Pro fits
I built Job Cost Pro because I needed it on my own jobs. Take a photo of the supply house receipt and the AI reads the store, the items, the tax and the total. It suggests the job when the receipt names it or you scan it at the jobsite, then you confirm with one tap. Hands full in an attic? Say the expense and it goes to the job (voice works in browsers with speech input, like Chrome and Safari, and in the iPhone app on version 1.0.8 or newer). When a worker reaches the job site, the iPhone app gives them a one-tap prompt to clock in. Extra work gets written down as a change order on the job (Pro plan or higher), and the job shows its cost so far, gross profit and margin while it is still open. For the trade page, see job costing software for electrical contractors.
Job Cost Pro is free: 3 active jobs at a time, 50 receipts a month, AI scanning included, no card.
Track your next job with Job Cost Pro
Scan receipts, confirm the suggested job, and see your recorded costs against your budget. Start with the free plan in your browser or get the iPhone app.
Google Play: US only.
Free plan available. Some features require a paid plan.
FAQ
What is job costing for electrical contractors?
It is tracking every cost of one job (wire, parts, labor, permits, subs, equipment) against the price of that job. It shows the profit of each job, not only the month.
Should I job cost service calls?
Yes. Service is mostly labor and drive time, and return trips take the profit. Cost at least a sample of calls to see which kinds pay.
How do I handle truck stock?
Write the parts that come off the truck to the job that used them. If you do not, your jobs look better than they are and your overhead looks worse.
Where does a failed inspection go?
On the job that failed it. The return trip, the extra hours and any new parts are costs of that job, not overhead.
What margin should an electrical job have?
It depends on your overhead and your market. Know your overhead first, then set the margin you need on top of it.