Construction Timesheet Template for Crews
This sheet is for the crew lead who collects hours on Friday and the owner who has to turn them into payroll and job cost. The layout below works on paper, on a clipboard in the truck, or copied into a spreadsheet. Once the hours are totaled, the labor cost calculator turns them into what that time really cost the job.
The weekly timesheet (print it or copy it)
One sheet per worker per week. Write clock times as they happen, not totals from memory. If a worker moves to a second job in the same day, use a second line for that day.
| Day | Job | Time in | Time out | Unpaid lunch (min) | Hours | Notes |
|---|---|---|---|---|---|---|
| Monday | ||||||
| Tuesday | ||||||
| Wednesday | ||||||
| Thursday | ||||||
| Friday | ||||||
| Saturday | ||||||
| Sunday |
That is the whole template: seven columns. The job column is the one most crews skip, and it is the one that decides whether your job costs are right. Hours with no job attached can be paid, but they cannot tell you which job made money.
How to fill out a construction timesheet
- Write the job
The job name or address the worker is on, before the first time is written.
- Write the time in and the time out
Clock times, like 7:05 and 4:20, not a total.
- Write the unpaid lunch in minutes
Write 30, not 0.5. You convert later, once.
- Start a new line for a new job
A move from one job to another in the same day gets its own line.
- Initial it
The crew lead initials the week before it goes to payroll.
Here is a filled-out week for one worker on one job. These are example times, not typical days.
| Day | Job | Time in | Time out | Unpaid lunch (min) | Minutes worked | Hours |
|---|---|---|---|---|---|---|
| Monday | Smith bath | 7:00 | 3:30 | 30 | 480 | 8.00 |
| Tuesday | Smith bath | 7:05 | 4:20 | 30 | 525 | 8.75 |
| Wednesday | Smith bath | 6:50 | 3:10 | 30 | 470 | 7.83 |
| Total | 1,475 | 24.58 |
How to total a week
Work in minutes until the very end. Monday 7:00 to 3:30 is 510 minutes; take out a 30-minute unpaid lunch and it is 480 minutes, which is 8 hours. Do the same for each day, add the minutes, then divide by 60 one time.
If a day shows minutes that do not land on a clean quarter hour, the minutes to decimal chart has every minute from 1 to 60. Use it on the week total, not on each day, so the rounding does not pile up.
3 timesheet mistakes that cost money
1. Minutes typed as decimals
Wednesday above is 7 hours 50 minutes. That is 7.83 hours. Typed as 7.50, the worker is shorted 0.33 hours, and the job is shown cheaper than it was. With the example loaded rate below, that one slip hides about $16 of labor on one day for one person.
2. Lunch taken out twice, or not at all
Pick one place for lunch on the sheet and stick to it. If the time out already reflects a lunch break and someone also subtracts 30 minutes, the day is short. If nobody takes it out, the day is long and the job carries hours nobody worked.
3. A split day put on one job
A worker on Job A from 7:00 to 11:30 and on Job B from 12:00 to 3:30 worked 4.5 hours on A and 3.5 hours on B. If the sheet says "Job A, 7:00 to 3:30, 30 minutes lunch", Job A carries all 8 hours. At the example loaded rate, about $166 of Job B's labor now sits on Job A. Job A looks worse than it is, and Job B looks like a better deal than it was, which is how the next bid on a job like B comes in too low.
| Line | Job | Time in | Time out | Minutes | Hours |
|---|---|---|---|---|---|
| Correct, line 1 | Job A | 7:00 | 11:30 | 270 | 4.50 |
| Correct, line 2 | Job B | 12:00 | 3:30 | 210 | 3.50 |
| Wrong, one line | Job A | 7:00 | 3:30 (30 lunch) | 480 | 8.00 |
From timesheet hours to job labor cost
Hours times the wage is not what the time cost you. Hours times the loaded rate is. In the labor cost calculator, with example inputs of a $30 wage, 10% taxes, 8% comp, $5 overhead per hour and 15% non-billable time, the burdened cost is $40.40 and the loaded cost per billable hour is $47.53. These are example inputs, not typical rates.
| Hours from the sheet | Labor cost at $47.53 an hour |
|---|---|
| 24.58 (the filled-out week) | $1,168.27 |
| 3.50 (Job B split hours) | $166.35 |
To see what those hours do to a job's total and margin, put them on the labor line of the job cost calculator. For the full loaded-rate math, read how to calculate labor cost.
Subcontractors and timesheets
A sub is not on your payroll, so a sub's time sheet is a record you ask for, not a pay sheet you run. It still helps on time and materials work, where the hours are what you bill. How you pay and report a sub is a separate question; see paying 1099 subcontractors.
When paper stops working
A paper timesheet works for a small crew. It gets hard when sheets come in late, times are written from memory on Friday, or nobody wrote the job. If you want a clock instead of a sheet, see how to run a construction time clock.
Where the app fits (honest limits)
I built Job Cost Pro so the crew clocks in on the job with one tap, and those hours land on the job at its labor cost next to the receipts, with the margin shown from costs recorded so far. A worker who clocked a day wrong can ask to fix it, and the owner approves or declines. It records crew pay; it does not move money. Free on the App Store: 3 jobs, 50 receipts a month, AI scanning included, no card. Get it here.
Print the blank week above for your crew, or try the other free contractor tools that run in your browser with no signup.
Track your next job with Job Cost Pro
Scan receipts, confirm the suggested job, and see your recorded costs against your budget. Start with the free plan in your browser or get the iPhone app.
Google Play: US only.
Free plan available. Some features require a paid plan.
FAQ
How do you fill out a construction timesheet?
Write one line per job per day: the job, the time in, the time out and the unpaid lunch in minutes. If a worker moves to a second job in the same day, start a new line for that job. Total the minutes for the week and divide by 60 once at the end.
What should a construction timesheet include?
The worker name, the week, and for each day the job, time in, time out, unpaid lunch, total hours and a notes column. The job column matters most for job costing, because hours with no job cannot show which job made money.
Should lunch be on the timesheet?
Yes. Write the unpaid lunch in minutes in its own column and take it out once when you total the day. Taking it out twice shorts the worker, and not taking it out puts hours on the job that nobody worked.
How do I split a day between two jobs on a timesheet?
Use two lines for that day, one per job, each with its own time in and time out. In the example on this page, 7:00 to 11:30 on Job A and 12:00 to 3:30 on Job B is 4.5 hours and 3.5 hours. Putting the whole day on one job moved about $166 of labor to the wrong job.
How do I convert timesheet minutes to decimal hours?
Add up all the minutes for the week, then divide by 60. 1,475 minutes is 24.58 hours. 7 hours 50 minutes is 7.83 hours, not 7.50. The minutes to decimal chart on this site lists every minute from 1 to 60.
Do subcontractors fill out timesheets?
A sub is not on your payroll, so their time sheet is a record you ask for, mostly on time and materials work where hours are what you bill. How you pay and report a sub is a separate question from the timesheet.