How to Price Landscaping Jobs (Install Work)
This post is about install work: sod, planting beds, mulch and pavers. Mowing routes are priced a different way and are not covered here. The example below takes one backyard from the tape measure to the number on the quote. Crew hours are the line that decides the margin, so start with a real loaded rate: the free labor cost calculator turns a wage into a true cost per billable hour.
How to price a landscaping job, step by step
- Split the job into parts
Sod, beds, hardscape, planting. Each part gets its own materials and hours.
- Figure materials
Area for sod and pavers, area times depth for mulch, gravel and sand. Add waste.
- Figure crew hours by part
From your own past jobs, including tear-out, grading and cleanup.
- Add equipment, delivery and disposal
Rentals, delivery fees, and hauling off old turf and dirt.
- Price it
Total cost, then overhead and profit on top.
The example job: replace 1,200 square feet of lawn with new sod, build a 300-square-foot mulch bed, and lay a 12 by 12 foot paver patio. Every input below is an example. Use your own supplier prices and your own crew hours.
Step 1: measure and figure the materials
Sod and pavers are bought by the square foot, so measure the area and add waste for cuts. Mulch, gravel and sand are bought by the cubic yard, so you need the area and the depth.
| Material | Quantity math | Example cost |
|---|---|---|
| Sod | 1,200 sq ft + 5% waste = 1,260 sq ft at $0.50 | $630 |
| Mulch | 3 cubic yards at $40 | $120 |
| Pavers | 144 sq ft + 10% cuts, about 160 sq ft at $4 | $640 |
| Gravel base, 4 inches | 144 x 4 / 12 / 27 = 1.8, order 2 cubic yards at $45 | $90 |
| Bedding sand, 1 inch | 144 x 1 / 12 / 27 = 0.44, sold by the yard | $40 |
| Edge restraint | Around the patio | $60 |
| Materials total | $1,580 |
Step 2: crew hours by part
Hours are where landscaping quotes miss. A patio is not just laying pavers: it is digging out, hauling the dirt, spreading and compacting the base, screeding sand, laying, cutting and sweeping. Sod includes cutting out the old lawn and grading. Use the hours from your own past jobs of the same kind, part by part.
At an example loaded cost of $35 an hour (wage plus taxes, comp and the hours you cannot bill), 48 hours is $1,680 of labor. If you have not built your loaded rate yet, read how to set your hourly rate.
Step 3: equipment, delivery and disposal
These are the lines that get forgotten on a quote and remembered on the bank statement. In the example, a sod cutter and a plate compactor for a day come to $250. Delivery of the materials plus hauling off the old turf and the dirt from the patio dig come to $230. Each one belongs on this job, not in overhead.
Step 4: put the price on it
The job cost is $1,580 of materials, $250 of equipment, $230 of delivery and disposal, and $1,680 of labor: $3,740. Now price it so the overhead and a profit are covered. With an example overhead of 15% of every dollar you bill and a 10% profit on cost:
If you do not know your overhead percentage, the overhead and profit calculator finds it from a year of overhead and revenue, and the construction overhead post lists what counts. The price above is a 22.7% margin, but only $374 of it is profit: the rest pays the truck, the trailer and insurance. Type the cost and price into the markup calculator to see both numbers before you send the quote.
What changes the numbers
- Dig conditions: clay, rock and roots add hours to every patio and bed. Walk the yard and dig a test hole before you price the hardscape.
- Access: no gate wide enough for a machine means wheelbarrows and more crew hours.
- Grade: a slope or a drainage problem is its own part of the job. Price it as its own line.
- Haul distance: far from the supply yard or the dump means more delivery and disposal cost.
Put each part on the quote as its own line, so the client can see what they are paying for and you can price a change cleanly. Work that shows up after the quote is a change order. If you are not sure whether you are sending a quote, an estimate or a bid, read quote vs estimate vs bid.
After the job: check the hours
A price is only as good as the hours behind it. Compare planned hours with worked hours on every install, part by part. Here is the example job when it is done.
Six extra hours at $35 is $210. The cost moves from $3,740 to $3,950, and the margin falls from 22.7% to 18.4%. Nearly all of it was the patio, so the next patio quote gets more hours, or a test hole first. Tracking those hours job by job is what landscaping job costing is about.
Mowing is priced a different way
Weekly mowing and maintenance are often priced per visit or per month, around a route, which is a different method from an install. This post does not cover it. For small one-day jobs that are not on a route, how to price handyman jobs compares hourly with flat pricing.
Where the app fits (honest limits)
A quote is a plan; the job tells you if it held. I built Job Cost Pro to record crew hours and receipts against each job, so the margin shows from the costs recorded so far while the job is still open. It does not measure yards or order materials. It is not a scheduling tool. Free on the App Store: 3 jobs, 50 receipts a month, no card. Get it here.
Track your next job with Job Cost Pro
Scan receipts, confirm the suggested job, and see your recorded costs against your budget. Start with the free plan in your browser or get the iPhone app.
Google Play: US only.
Free plan available. Some features require a paid plan.
FAQ
How do you price a landscaping job?
Split the job into parts (sod, beds, hardscape), figure each part from its area and depth, and figure crew hours from your own past jobs. Add equipment, delivery and disposal, then price the total cost for overhead and profit. In the example in this post, $3,740 of cost became a $4,840 price.
Should I price landscaping by the square foot?
Use square feet to figure materials and to check your price against past jobs, not as the whole method. A square-foot price hides the things that change the hours, such as dig conditions, access, grade and haul distance. Price those as their own lines.
How much mulch do I need for a bed?
Multiply the square feet by the depth in inches, divide by 12 and then by 27 to get cubic yards. In the example in this post, a 300-square-foot bed at 3 inches deep is 2.8 cubic yards, so the order is 3 cubic yards.
How much gravel base does a paver patio need?
It depends on the design and the soil, so follow your paver maker and your own standard. The math is the same as mulch: square feet times depth in inches, divided by 12 and by 27. In the example, a 144-square-foot patio with a 4-inch base needs about 1.8 cubic yards, so 2 are ordered.
What markup should a landscaper use?
Enough to cover your overhead and leave a profit, which depends on your own costs. The example in this post uses 15% overhead and 10% profit, which comes to a 22.7% margin on the price. Work out your overhead first, then set the markup from it.
Is mowing priced the same way as an install?
No. Mowing and maintenance are often priced per visit or per month around a route, which is a different method. This post covers install work such as sod, beds and pavers, where each job has its own materials and hours.