How to Set Your Hourly Rate as a Contractor
The first hourly rate I ever charged was my wage plus a few dollars. It felt fair. It was also how I lost money on jobs that looked busy. A wage is what one hour costs before taxes, insurance, drive time and the office. Run your own numbers through the free labor cost calculator and read the box called true cost per billable hr. That number, not the wage, is where a rate starts. Just getting set up? Here is how to start a construction business, money side first. For a crew rate carried into an install bid, see how to price landscaping jobs.
Why your wage is not your rate
An hourly rate has three layers, and each one has to be paid by the hours you bill:
- Cost
The wage, plus employer taxes and workers' comp, spread over the hours you can actually bill.
- Overhead
The truck, insurance, phone, software, office time. It does not belong to one job, but every job has to carry a share.
- Profit
What is left for the company after the first two. Without it, a good year and a bad year look the same in the bank.
Skip any one of the three and the rate is too low, even when every hour is billed.
Step 1: your true cost per billable hour
Start with the wage. Add the employer taxes and workers' comp as percentages of that wage. The IRS sets the employer share of Social Security at 6.2% and Medicare at 1.45%, which is 7.65% together (IRS Topic 751, read November 13, 2026; the Social Security part stops at $184,500 of wages in 2026). Federal and state unemployment taxes come on top and vary by state, and your comp rate comes from your carrier. That gives the burdened cost of a paid hour.
Then divide by the share of paid hours you can bill. Drive time, supply runs, shop time and callbacks are paid but not billed. If 20% of paid hours are not billable, each billable hour has to carry 1 divided by 0.80 of the cost. The how to calculate labor cost post builds the same loaded rate by hand, line by line.
Step 2: overhead as a share of the price
Overhead is easiest to measure for a whole year: total overhead divided by total revenue. The overhead and profit calculator finds that percentage from those two yearly numbers, then prices the hour. If you want the list of what counts, read construction overhead.
One warning. The labor calculator also has an optional box for overhead per labor hour. If you put overhead there, do not add it again as a percentage in step 2. Pick one place. In this post, the overhead per hour box stays blank and overhead comes in as a share of the price.
Step 3: profit on top
Profit is a percentage of cost that you choose. The price then has to cover the cost, the profit and the overhead share at once:
Dividing by (1 - overhead %) is what makes overhead a true share of the price. Adding the overhead percentage to the cost instead comes out a little short every time, and the gap grows as overhead grows.
Worked example: a $26 wage to $49.63 an hour
These are example inputs, not advice and not a typical rate. The 10% for taxes stands in for the 7.65% federal employer share plus unemployment taxes, which vary by state.
| Step | Tool and inputs | What the tool shows |
|---|---|---|
| 1 | Labor cost calculator: wage $26, taxes 10%, comp 8%, overhead/hr blank, non-billable 20%, 40 hours | Burdened $30.68, true cost per billable hr $38.35, this job labor $1,534.00 |
| 2a | Overhead and profit calculator, step 1: overhead $72,000, revenue $480,000 | Overhead 15.0% |
| 2b | Overhead and profit calculator, step 2: cost $38.35, profit 10% | Price $49.63, overhead $7.44, profit $3.84, margin on price 7.7% |
| 3 | Markup calculator, price mode: cost $38.35, price $49.63 | Markup 29.4%, margin 22.7%, profit $11.28 |
So 40 billable hours at $49.63 is $1,985.20. The $38.35 cost, the $7.44 overhead share and the $3.84 profit add up to the $49.63 price.
Check it: what markup and margin did you just charge?
Type the cost and the price into the markup calculator to see the markup and margin you just set: a 29.4% markup and a 22.7% margin. That 22.7% looks like a lot of profit. It is not. The overhead share sits inside it. After overhead, the profit is $3.84 on a $49.63 hour, a 7.7% margin.
This is the gap that sinks hourly bids. A contractor sees a 22% margin, cuts the rate to win a job, and cuts straight into the overhead money. If the two words blur, read markup vs margin, and compare your number with the average markup on labor and materials.
If it is just you
A one-person shop works the same way. Use the pay you want per hour as the wage. If you are self-employed, the IRS self-employment tax is 15.3% (12.4% Social Security and 2.9% Medicare, IRS self-employment tax page, read November 13, 2026). Putting 15.3% in the taxes box is a simple stand-in, not your real tax bill. This is not tax advice: ask your tax pro what to plan for.
Using the rate on bids and change orders
On a fixed bid, the rate times the hours you expect is the labor line. On a time-and-materials job, the rate is what the client sees on every hour you bill. On extra work, the same rate is how you price a change order without guessing on the spot.
Re-run the three steps once a year, and any time your comp rate, your crew size or your overhead changes. Charging last year's rate after a new truck payment is one of the common bidding mistakes. If you work alone on small jobs and are deciding between hourly and a flat price, read how to price handyman jobs.
Where the app fits (honest limits)
A rate is a plan. The job is where you find out if it held. I built Job Cost Pro to record crew hours and receipts against each job, so the margin shows from costs recorded so far, while the job is still open. It is not a scheduling tool. Free on the App Store: 3 jobs, 50 receipts a month, AI scanning included, no card. Get it here.
Start with step 1 in the labor cost calculator today. Most contractors find out their true cost is well above the wage they had in their head.
Track your next job with Job Cost Pro
Scan receipts, confirm the suggested job, and see your recorded costs against your budget. Start with the free plan in your browser or get the iPhone app.
Google Play: US only.
Free plan available. Some features require a paid plan.
FAQ
How do I calculate my hourly rate as a contractor?
Find your true cost per billable hour: wage times (1 + employer taxes % + comp %), divided by the share of paid hours you bill. Then add overhead and profit with price = cost x (1 + profit %) / (1 - overhead %). In the worked example in this post, a $26 wage becomes a $49.63 hourly price.
What should a general contractor charge per hour?
There is no honest single number. The right rate depends on your wage, taxes, comp rate, how many paid hours you can bill, your overhead and the profit you want. Build your own rate from those numbers instead of copying a rate from another market.
What is my true cost per billable hour?
It is what one hour you can bill really costs you: the wage plus employer taxes and workers comp, divided by the share of paid hours you bill. If 20% of paid time is drive, shop and supply runs, each billable hour carries 1.25 times the burdened cost.
Do I count drive time and shop time in my rate?
Yes. You pay for those hours even though you cannot bill them, so they go into the non-billable share. That share raises the cost of every hour you do bill. Leaving it out is one of the most common reasons an hourly rate comes out too low.
Should overhead go in my hourly rate or on the bid?
Either works, but only once. You can add overhead per labor hour in the labor step, or add it as a share of the price in the overhead step. Using both counts the same truck and insurance twice and prices you out of jobs.
Is 10% profit on my rate the same as a 10% margin?
No. Profit of 10% on cost is a smaller share of the price. In the example in this post, 10% profit on a $38.35 cost is $3.84, which is 7.7% of the $49.63 price. The 22.7% margin the markup calculator shows includes the overhead share, not just profit.