How to Price Pressure Washing Jobs and Track Costs

The goal is a price you can explain and a cost record you can use on the next job. A square-foot rate helps you check a quote once you have some job history. Your own job records show what that rate covers when the layout, the setup time or the crew changes. To add up one job from its parts, the free job cost calculator shows the price, the profit and the margin.

Define the work before you quote
- List each surface
A driveway, its walkway and a patio are three items. Written apart, they are easier to measure and talk about.
- Note the hard parts
Edges, tight access, and any surface that needs a closer look.
- Check the site
Where the crew parks and sets up, where the water comes from, and who moves the cars and furniture.
- Write the scope
Which surfaces are in, what the customer does before you arrive, and what would need its own quote.
These details change how long setup and cleanup take, not only the washing time. If the customer adds another surface, price that area on its own and agree on the added work and price before you start it. Keep the new scope with the first quote, so you can explain the difference at closeout.
Build your job cost estimate
Start with crew time: travel for this job, setup, washing, cleanup and packing up. Add up each person's hours. If two people spend the same time on site, both sets of hours go in. Count the owner's hours too when the owner is on the crew.
Multiply the hours by your labor cost per hour, with the wages and other labor costs your business carries. If people cost different amounts, price each person on their own and add the results. Then you can tell later whether a gap came from extra hours or a different crew.
Add the supplies you expect to use and the equipment you rent or assign to the job. Add the vehicle cost for the trip and any supply run. Next to each line, note where the number came from: a supplier quote, a rental quote or the cost on a similar finished job.
Turn the cost into a price
Margin is what is left after costs, as a share of the price. Markup is what you add, as a share of the cost. Write down which one you use when you set a price, so you can repeat it when the costs change. See markup vs. margin.
Check the quote against similar finished jobs. If you divide the price by the area, compare it with jobs that had the same kind of surfaces, access and included work. If it is far off from your own history, check what changed. A longer setup, a long drive or a second surface can explain it.
Fictional worked example: a driveway and walkway
| Cost | Quote | At closeout |
|---|---|---|
| Labor | $180 | $198 |
| Supplies | $55 | $48 |
| Equipment | $45 | $45 |
| Travel | $40 | $40 |
| Direct job costs | $320 | $331 |
| Overhead share | $80 | $80 |
| Total cost | $400 | $411 |
The contractor picks a 20% target margin. $400 divided by 0.80 is a $500 quote, which leaves $100 after the costs, or 20%. The scope and price stay the same. At closeout the crew logged 5.5 person-hours, $198 at the same rate. Supplies came in $7 under and labor $18 over, so the total cost is $11 over. At the agreed $500, $89 is left, a 17.8% margin for this fictional job with the same overhead share.
Track costs as the job goes
Use the same job name on the quote, the time records, the receipts and the change notes. Record crew time after the work and check that the hours belong to that job. Save the supply receipts. If one purchase covers several jobs, split it by the items each job used. See how to split one receipt across jobs.
Spreadsheet or a job costing app
A spreadsheet works with a cost log. Give each cost a date, a job name, a category, an amount and a note on the record behind it. Keep the quoted and recorded totals side by side, and use the same job name every time.
In Job Cost Pro, you log costs by taking a photo of a receipt or typing them in. When a purchase receipt names the job or its PO, the app suggests the job; tap once to confirm. If there is no suggestion, pick the job yourself. With a jobsite address on the job and their own logins, workers tap the iPhone arrival prompt once to clock in. On Contractor and up, the owner can turn on automatic clock-in for a worker, and the worker agrees in the iPhone app; it only happens between 6 a.m. and 8 p.m. in the owner's payroll time zone.
Try Job Cost Pro on your next pressure washing job. Free plan: 3 active jobs at a time, 50 receipts a month. Free plan available. Some features require a paid plan.
Review the job before you quote the next one
At closeout, check that the hours, the receipts and any late charges are in. Compare each cost with its quote line, then write one note for the next quote. If setup ran long because of parking or access, add that to your walk-through questions. Keep the quoted and recorded totals together; over time they show which numbers to check before the next price.
Track your next job with Job Cost Pro
Scan receipts, confirm the suggested job, and see your recorded costs against your budget. Start with the free plan in your browser or get the iPhone app.
Google Play: US only.
Free plan available. Some features require a paid plan.
FAQ
Should I price by square foot or by the job?
Build a price for the full scope first. A square-foot figure helps you compare quotes for similar jobs. Check that the jobs you compare had the same work, crew time and access before you use the figure.
How do I count labor when my helper and I both work?
Add your hours to your helper hours to get the total person-hours, with setup and cleanup. If your costs per hour are different, work out each person on their own, then add them.
Where do travel and equipment go in the quote?
Put the job share of travel and equipment in the cost. Record crew travel time with labor if that is how you track it. Keep vehicle cost and equipment on their own lines so you can see what they cover.
What if the customer asks for more work after I quote?
Describe the added surface or task, work out what it takes, and agree on the price change before you do it. Keep the new scope and price with the first quote.
Can I check the margin while the job is open?
Yes. Look at the costs recorded so far and list what is missing. For the final margin, add the costs you still expect, take the total from the agreed price, and divide by the price.