How to Price a Painting Job (Worked Example)
Most pages on this topic are cost guides for homeowners. This one is for the painter writing the price. It walks one interior job from the tape measure to the number on the quote, with every step shown, so you can run the same math on your next job. The labor line is where painting prices go wrong most, so start with a real loaded rate: the free labor cost calculator turns a wage into a true cost per billable hour.
How to price a painting job in five steps
- Measure
Square feet of wall, ceiling and trim you will paint, with doors and windows taken out.
- Paint and materials
Gallons from the area, the coats and the coverage on the label, plus supplies.
- Labor hours
Prep, painting and cleanup hours, from your own production rate.
- Price
Labor at your loaded rate, plus materials, plus a markup for overhead and profit.
- Check it
Divide the price by the square feet and compare it with your last jobs.
The example job: repaint the walls of four bedrooms, each 12 by 14 feet with 8-foot ceilings, two coats, in an empty house. Every input below is an example. Use your own measured numbers on your own jobs.
Step 1: measure what you will paint
Wall area is the distance around the room times the wall height. Take out doors and windows, because you will not roll them. Measure ceilings, trim and doors as their own lines if they are in the job.
| Line | Math | Square feet |
|---|---|---|
| Walls of one bedroom | 2 x (12 + 14) x 8 | 416 |
| Take out 1 door and 1 window | 21 + 15 | - 36 |
| Paintable wall, one bedroom | 416 - 36 | 380 |
| Four bedrooms | 380 x 4 | 1,520 |
| Paint to cover (2 coats) | 1,520 x 2 | 3,040 |
Step 2: paint and materials
Read the coverage on the can label: it says how many square feet one gallon covers. Rough or porous walls use more. In this example the label says 350 square feet a gallon.
At an example $50 a gallon, 9 gallons is $450. Add the supplies the job uses up: tape, plastic, patch, caulk, roller covers. Call it $120 here. Materials for the job come to $570.
Step 3: labor hours from your production rate
Your production rate is how many square feet one painter covers in an hour, cutting in and rolling, on your jobs. Do not borrow a number from a forum: time your own crew on a few jobs and use that. In this example the rate is 160 square feet an hour per coat, so 3,040 square feet takes 19 hours of painting.
Painting is not the whole job. Moving furniture, patching, caulking and taping take time, and so do setup and cleanup each day. Here, prep is 2 hours a room and setup plus cleanup is 3 hours.
That is 30 hours. At an example loaded cost of $40 an hour (wage plus taxes, comp and the hours you cannot bill), labor is $1,200. If you have not built your loaded rate yet, read how to set your hourly rate first.
Step 4: put the price on it
The job costs $1,200 of labor plus $570 of materials: $1,770. Now add a markup that pays your overhead and leaves a profit. In this example the markup is 50% on cost, or $885, so the price is $2,655.
A 50% markup is a 33.3% margin on the price, not a 50% one. If those two words blur, read markup vs margin, and type your own cost and price into the markup calculator to see both. To compare your markup with what other trades use, see the average markup on labor and materials.
Step 5: check it per square foot
Divide the price by the wall area: $2,655 / 1,520 = about $1.75 a square foot of wall. Keep that number from every job you price. After a few jobs, a quote that comes out far above or below your own past numbers tells you to check your inputs before you send it.
What changes the numbers
- Coats: a big color change or a fresh patch can need a primer coat or a third coat. That is more gallons and more hours: price it, do not absorb it.
- Ceilings, trim and doors: each is slower per square foot than open wall. Give each its own line with its own hours.
- Repairs: drywall patches, caulk and sanding are prep hours. Walk the job before you price it.
- A furnished home: moving and covering furniture adds prep hours to every room.
- Exterior work: ladders, height and weather add setup time and days. Price the access, not only the area.
Put these on the quote as separate lines, so the client sees what they are paying for and you can price a change cleanly. Work that shows up after the quote is a change order, not a favor. If you are not sure whether you are sending a quote, an estimate or a bid, read quote vs estimate vs bid.
After the job: check your hours
The price is only as good as the production rate behind it, and the only way to know your rate is to compare planned hours with real hours on each job. Here is the example job when it is done.
Four extra hours at $40 is $160. The cost moves from $1,770 to $1,930, and the margin drops from 33.3% to 27.3% ((2,655 - 1,930) / 2,655). Most of it was prep, so the next quote gets more prep hours a room. That habit of tracking hours by job is what painting contractor job costing covers in depth. If you also take small one-day jobs, how to price handyman jobs compares hourly with flat pricing.
Where the app fits (honest limits)
A price is a plan; the job tells you if it held. I built Job Cost Pro to record crew hours and receipts against each job, so the margin shows from the costs recorded so far while the job is still open. It does not measure rooms or set your production rate. It is not a scheduling tool. Free on the App Store: 3 jobs, 50 receipts a month, no card. Get it here.
Track your next job with Job Cost Pro
Scan receipts, confirm the suggested job, and see your recorded costs against your budget. Start with the free plan in your browser or get the iPhone app.
Google Play: US only.
Free plan available. Some features require a paid plan.
FAQ
How do you price a painting job?
Measure the square feet you will paint, figure the gallons from the coats and the coverage on the label, and figure the labor hours from your own production rate. Cost the hours at your loaded labor rate, add paint and supplies, then add a markup for overhead and profit. In the example in this post, that came to $2,655 for four bedrooms.
Should I price painting by the square foot?
Use square feet to build the price and to check it, not as the whole method. A price per square foot hides the things that change the hours, such as a big color change, ceilings, heavy patching or a furnished room. Price those as their own lines.
How many gallons of paint do I need for a room?
Multiply the paintable square feet by the number of coats, then divide by the coverage per gallon printed on the label. In the example in this post, 380 square feet of wall per bedroom, two coats, at 350 square feet a gallon, is a little over 2 gallons a room.
How long does it take to paint a room?
It depends on your crew, the prep and the surface, so time your own jobs. In the example in this post, at 160 square feet an hour per coat plus 2 hours of prep, one 12 by 14 bedroom with two coats took about 6.75 hours, before setup and cleanup.
What markup should a painting contractor use?
Enough to cover your overhead and leave a profit, which depends on your own costs. The example in this post uses a 50% markup on cost, which is a 33.3% margin on the price. Work out your overhead first, then pick a markup that covers it.
What should I charge extra for on a painting job?
Anything that adds hours or materials beyond plain walls: a primer or third coat, ceilings, trim and doors, drywall repairs, moving furniture, and ladder or height work outside. List each one on the quote so the client sees it and you can price changes cleanly.